Vancouver Skytrain
|
|
|
|
Vancouver Skytrain units 001-156 were built by UTDC from 1984 to 1995 and operate on standard gauge. The design of the first units were based upon the Scarborough RT units but are fully automated (without driver). Skytrain 028, from the first batch, departs Main Street station towards downtown on Friday May 27th, 2005. |